Project
Hotel Leela
A two-year payback identified on a 400,000 sq ft resort.

Keys
120
Built-up area
400,000 sq ft
Annual electricity
8,644,404 kWh
Payback period
2 years
Litedares reviewed the building's energy and water systems, established the baseline and recommended efficiency and facility improvement measures. Analysis of the tariff structure alone identified savings of INR 600,000 to 800,000 a year by shifting peak loads off peak.
Litedares scope
- HVAC configuration review: chillers, AHUs, cooling towers, pumps
- Tariff and peak-load analysis
- Building management system recommendation
- Variable frequency drives on AHUs and chilled water pumps
- Chiller condenser maintenance regime
Start a conversation
Let's build something worth certifying.
Tell us about the project: the site, the programme, the ambition. We will tell you what is achievable and what it takes.